Apply to Taiwan Power Company for actual construction

The complete process of solar power plant construction is from planning, application, filing, installation to the final formal power supply.

Luke's Service

Planning and Design

Site survey, planning layout, briefing.

Apply for parallel operation from Taiwan Power Company

Parallel review, preliminary consultation, issuance of parallel review opinion , sign a house roof lease contract.

Application to the Energy Bureau for record

Issue approval and filing documents, exempt from miscellaneous license applications, decide on electricity sales methods, sign electricity sales contracts, and review written materials.

System Installation

Apply for parallel trial operation, check parallel related equipment and start planning for installation, issue parallel trial operation inspection completion documents, apply for equipment registration, review written materials, conduct on-site inspection, and issue equipment registration documents.

Start power transmission

Complete grid connection with Taipower, start selling electricity, and decide on the electricity sales method.

Maintenance monitoring

Clean and inspect solar panels, inspect supports and structures, check cables and connectors, monitor system health, and perform regular service and maintenance on equipment.

Luke Solar Energy Company's actual construction

Install brackets, solar panels, inverters, and test, debug and monitor after connecting to the grid.

Trail Installation

Enhance work safety, protect solar panels, and facilitate subsequent maintenance.

Connecting to the grid

Connect the inverter to the grid to connect the solar power generation system to the existing power system.

Surfboard replacement

According to the evaluation results and customer needs, choose the appropriate Sina board, considering factors such as material, size, design and price.